The ceramic catalyst filter and high-temperature ceramic fiber filter for denitrification, desulfurization, dust removal, removal of dioxins/HCl/HF Supply to Malaysia in RM. Local
The ceramic catalyst filter and high-temperature ceramic fiber filter for denitrification, desulfurization, dust removal, removal of dioxins/HCl/HF Supply to Malaysia in RM. Local
Contact us for more information about Ceramic | Malaysia
Contact us for Malaysia
Contact Us
ZTW Environmental Protection Technology Co., Ltd. focuses on the field of industrial flue gas treatment, and is committed to providing integrated solutions for denitrification, desulfurization, defluorination, dust removal and ammonia removal with ceramic catalytic filter tubes and ceramic fiber filter tubes as core technologies. Relying on the concept of ceramic integrated design, the company integrates catalysis, filtration and dust removal functions into high-performance ceramic tubes. Its denitrification efficiency is more than 95%, and its dust removal efficiency exceeds 99.99%, which is suitable for high-pollution industries such as glass kilns, steel, and coking.
ZTW Tech supplies ceramic catalytic filter elements and ceramic fiber filter elements to Malaysia industrial operators. Local project pricing is quoted in RM (MYR), and every quotation includes technical drawings and a technical data sheet in metric units.
Key industries served in Malaysia
palm oil processing mills
industrial boiler houses
smelting and metal processing
waste-to-energy plants
ceramic tiles kilns
Standards and compliance for Malaysia
DOE Environmental Quality Act 1974
Malaysian scheduled waste regulations
SIRIM product certification
Applications by industry
Palm oil processing mills
Boiler flue gas at 180-260°C with high particulate from fibre and shell, and frequent load swings as the mill runs. The element profile is selected for stable performance across that load range.
Ceramic tiles kilns
Roller hearth and tunnel kilns at 1200-1400°C where NOx from the combustion air preheat is the main compliance issue. The catalytic element is installed downstream of the preheater where the gas temperature remains high.
Smelting and metal processing
Induction and blast furnaces with off-gas at 350-600°C and high dust loading, where ceramic elements replace baghouses in the hot end and cut bag change frequency in tropical humidity.
Regulatory compliance in Malaysia
Malaysian industrial discharges are regulated by the Department of Environment under the Environmental Quality Act 1974, with scheduled waste rules and ambient air quality standards applied per installation. Equipment is commonly specified to SIRIM product certification where required, and scheduled waste returns and stack monitoring form part of the compliance file for installations near urban areas.
Supply, lead time and logistics
Quotations are issued in MYR with 30-day validity. Elements are shipped by sea to Port Klang, Penang or Pasir Gudang, typically 16-22 days, or by air in 5-8 days. Stocked diameters can be dispatched within 3 days, and the installation drawing set is included with every order.
Malaysia
Technical support is provided in English with RM quotation and local lead-time guidance. Request a free filter sample or discuss an OEM / ODM programme.
Search coverage for Malaysia
Content for Malaysia is indexed in Google Malaysia, Bing Malaysia.
Malaysia
Malaysian
Peninsular
Sabah
Sarawak
Johor
Frequently asked questions
Are the filters suitable for DOE scheduled waste requirements?
Yes. We supply the material and performance documentation required for the DOE compliance file, and the low-resistance element geometry is what keeps efficiency stable when the dust loading changes with the process.
What are the lead times to Malaysia?
16-22 days by sea to Port Klang, Penang or Pasir Gudang and 5-8 days by air, with stocked diameters shipped within 3 days. Every quotation states the manufacturing window and the shipping route.
Do you support Malaysian installers?
Yes. We provide installation drawings, torque specifications and commissioning checklists, and we support local installation teams with remote technical support and commissioning attendance on larger projects.
ZTW
We will reach you within 1 hour.
2026-11-26 11:35:18
Hello, welcome to ZTW. Please reach out to us at any time.
We have received your ticket and will get back to you within 24 hours.